© 2026

Agtnan is a single player 3D first-person action game where the player, as an escaping robot, endeavors to survive a horde of nightmarish monsters, either by eluding their detection or killing them before they kill you. Set in various outlandish arenas, from underground storage bunkers to floating platforms composed of rotating gears to factories replete with conveyor belts and portals, the variety and uniqueness of each map gives each its own character.
Take control of your robot's destiny in AGTNAN: Monster Shutdown Sequence! Featuring unique maps, themes, and mechanics, you'll need to be quick on your feet and use your wits to survive. Use explosive boxes, warp tubes, moving floors, portals and more to outsmart the enemy and make it to the end. Put those monsters in their place with the Monster Shutdown Sequence - an exciting adventure for robot-lovers of all ages!
Put your skills to the test and navigate through unique arenas full of intense action and thrilling challenges. Outlast waves of monsters with bombs, puzzles, and physics-based mechanics, while exploring fun and exciting theme maps. Experience classic 90s-inspired FPS arenas at your own pace, while mastering each map's danger and traps in order to survive the shutdown.
• Take on each uniquely designed map with its own set of thrilling elements and obstacles. • Fight back with powerful weaponry, including explosive boxes that spawn regularly. • Improve your tech abilities with fallen enemies' Creds and unlock even more powerful features. • Relive the golden age of arena FPS gaming with classic 90s visuals and mechanics.
English
No reviews yet. Be the first to share your thoughts!
Write a Review
Taking All the Credit
10.0%
A True Survivor
10.0%Hidden Achievement
10.0%
The Conquering Hero
15.0%
Self Destruction Sequence
20.0%No discussions yet. Be the first to start a conversation!